today I moved the pump for the sink in the ensuite I had foolishly installed it over a bedroom where it was a bit noisy so I though I would move it to over the garage. Quick job,, extend the pipework and the mains lead, two hours at the most.
When I started I wasn't happy with the isolating valves on the pipework to the pump and decided to replace them while I was at it. Drained the system down, replaced the valves, turned the mains back on to fill the tank while I got on with the pipework. I decided to start at the new pump location and work back to the isolating valves.
Today's tip is to make sure the new valves are closed before turning the mains on. Fortunately I noticed water gushing out of the hot water valve quite quickly but there was still a hell of a lot of water sloshing around under the fully boarded floor in the attic. Mad panic ripping the floor up and soaking up as much water as I could. Right over our new ensuite and freshly decorated master bedroom, complete with newly skimmed ceilings....
Think I have got away with it, we'll see in the morning....
Hope this has cheered you all up
When I started I wasn't happy with the isolating valves on the pipework to the pump and decided to replace them while I was at it. Drained the system down, replaced the valves, turned the mains back on to fill the tank while I got on with the pipework. I decided to start at the new pump location and work back to the isolating valves.
Today's tip is to make sure the new valves are closed before turning the mains on. Fortunately I noticed water gushing out of the hot water valve quite quickly but there was still a hell of a lot of water sloshing around under the fully boarded floor in the attic. Mad panic ripping the floor up and soaking up as much water as I could. Right over our new ensuite and freshly decorated master bedroom, complete with newly skimmed ceilings....
Think I have got away with it, we'll see in the morning....
Hope this has cheered you all up